40_custers-schoorsteensteiger-enkel--of-dubbelzijdig_20150528135745711.jpg
40_custers-schoorsteensteiger-enkel--of-dubbelzijdig_20150528135914241.jpg
Custers chimney scaffold

Custers chimney scaffold

By using the standard components from the tower scaffolds (frames, guardrail frames, horizontals and platforms) and adding just three
specific components ( ladder, ridge support and base support) a safe and comfortable working floor on height is a fact. The composition can be varied from single to double version, also platform length, erection height, slope and ladder length can vary. Moreover, by using platform carrying beams in the scaffold tower alongside the building, a chimney at the top end of a ridge can be scaffolded on all sides.
Platform Wooden platforms
Ask a question about this product


Download User manual
Download leaflet

Specifications

  • Available at a length of: 1.8m, 2.5m or 3.05m
  • Width: 0.7m or 1.3m
  • Suitable for 30º to 60º roof pitch
  • Maximum load 200 kg/m2
  • Working on a chimney with Health and Safety regulations
  • No roof anchorage needed
  • Available as a construction on one single side or on either side